Shandong Shouguang Wind Power Project is invested by Huaneng Group and their American partner, and the total investment is 559 million RBM.
33 sets of 1.5MW wind turbines will be installed, and about 96.5 million KWH power could be transfered to the power grid each year after the operation starts at the end of December 2008.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment