CSG Holding disclosed that their polysilicon project executed by Yichang Nanbo Silicon is testing polysilicon production now.
The first phase project capacity is 1,500 metric ton polysilicon, and the construction began in June 2007, and the construction, equipment installation and adjustment and personnel training have be finished as scheduled, and they are testing the polysilicon production now.
Showing posts with label CSG Holding. Show all posts
Showing posts with label CSG Holding. Show all posts
Wednesday, November 19, 2008
Subscribe to:
Posts (Atom)
